Home / Beale - 851st SMS / Construction 34
- 005-1
Aerial view of construction at Beale 851-B. View looking south showing excavated site. Power house and control center dome concrete forms are nearly complete. Taken: circa July, 1960 Source: unknown Photo courtesy of Joseph Viscuso - 002-1
Aerial view of construction at Beale 851-B. View looking roughly northeast showing excavated site with early structure sites being prepared. Site has been laid out and foundations for control center and power house are being built. Taken: May 3, 1960 Source: unknown Photo courtesy of Joseph Viscuso - 004-1
Aerial view of construction at Beale 851-B. View looking roughly northeast showing excavated site with early structure sites being prepared. Site has been laid out and foundations for control center and power house are being built. [Duplicate scan] Taken: May 3, 1960 Source: unknown Photo courtesy of Joseph Viscuso - titan group001-1
Construction at Beale 851-A, silo #1 showing the missile cribwork and its piecewise installation well in progress viewed from the motor elevator platform. Note the safety netting at a depth of about 90 feet, with workers bolting the crib sections together just above the net near the top center of the photo. Taken: July 24, 1961. Source: Martin Co.