26/37
Construction at Beale 851-A, Equipment terminal #2, level I, showing the hydraulic reservoir and control panel (at left, with a back panel removed) in place with other equipment awaiting installation. Taken: July 24, 1961. Source: Martin Co.
- Posted on
- Tuesday 12 January 2021
- Albums
- Visits
- 9642