456/735
Blast lock #2, Lowry 724-C showing floor beams and missing deck plating along with water, fuel and other piping. The tunnel to launcher #1 is to the left and the tunnel to blast lock #1 can be seen on the right. Taken: August 3, 2005 Source: Myself
- Posted on
- Tuesday 12 January 2021
- Albums
- Visits
- 16445