Construction at Beale 851-A, Equipment terminal #3, level I showing the hydraulic reservoir and control panel (at left) in place with other equipment awaiting installation. Taken: July 24, 1961. Source: Martin Co.
Titan I Photos from Past to Present
Construction at Beale 851-A, Equipment terminal #3, level I showing the hydraulic reservoir and control panel (at left) in place with other equipment awaiting installation. Taken: July 24, 1961. Source: Martin Co.