Construction at Beale 851-B showing the partially sealed exterior of the control center dome and adjoining tunnels still in the process of installation. The fuel terminal and blast lock are visible behind the dome, and to the left the main tunnel junction and power house air intake can be seen. Taken: December 20, 1960 Source: unknown Photo courtesy of Joseph Viscuso